PUD Ordinance -
Golf View Office Park #9 of 1999
CASCADE CHARTER TOWNSHIP
Ordinance #9 of 1999
AN ORDINANCE TO AMEND THE CASCADE CHARTER TOWNSHIP ZONING ORDINANCE
AND ZONING MAP TO ESTABLISH THE GOLF VIEW OFFICE PARK PLANNED UNIT
DEVELOPMENT PROJECT
Cascade Charter Township Ordains:
Section I. An amendment to The Cascade Charter Township Zoning
Ordinance.
The application received from Sports Plex Properties of Cascade or
their assigns (hereinafter referred to as the "Developer"), for
Planned Unit Development designation for the proposed Golf View Office
Park Development Project (hereinafter referred to as the "Project"),
was recommended by the Cascade Charter Township Planning Commission
for approval on September 7, 1999. The Project is recommended for
rezoning from an existing Health Plex PUD, Planned Unit Development,
to PUD, Planned Unit Development permitting an office complex. This
action requires an amendment to the Cascade Charter Township Zoning
Ordinance and Zoning Map to incorporate the Planning Commission’s
recommendation and the Cascade Charter Township Board of Trustees’
action on September 30, 1999.
Section II. Legal Description.
The legal description of the Project is as follows:
Lots 17 through 32, inclusive, Cascade Gardens (Liber 35 of Plats,
Page 17) and part of the Northeast one-quarter of Section 6, Town 6
North, Range 10 West, Cascade Township, Kent County, Michigan, and all
being described as: COMMENCING at the East one-quarter corner of said
Section 6; thence North 88 degrees 31’00" West 1322.96 feet along the
East – West one-quarter line to the Southeast corner of the West
one-half of the Northeast one-quarter of said section; thence North 88
degrees 31’00" West 500.00 feet along the East – West one-quarter line
to the TRUE PLACE OF BEGINNING; THENCE North 00 degrees 25’44" West
2093.28 feet along a line which goes through a point being 101.65 feet
Northwesterly (as measured along a line being parallel with and 70.00
feet Southwesterly of the centerline of Cascade Road) of the West line
of the East 500.00 feet of the west one-half of the Northeast
one-quarter of said section; thence South 47 degrees 00’53" East
129.84 feet along a line being parallel with and 50.00 feet
Southwesterly of the centerline of Cascade Road; thence Southeasterly
466.35 feet parallel with said centerline on a 17238.73 foot radius
curve to the left, the chord of which bears South 47 degrees 47’23"
East 466.34 feet; thence South 48 degrees 33’53" East 728.99 feet
parallel with said centerline; thence southeasterly 109.15 feet along
the Northeasterly line of Lot 17 of Cascade Gardens on a 105.69 foot
radius curve to the right, the chord of which bears South 18 degrees
58’48" East 104.36 feet; thence South 10 degrees 36’16" West 986.00
feet along the West right of way line of Galbraith Avenue; thence
southerly 178.04 feet along said right of way line on a 1265.02 foot
radius curve to the left, the chord of which bears South 06 degrees
34’21" West 177.89 feet to the Southeast corner of Lot 32 of said
plat; thence South 85 degrees 43’51" East 44.90 feet along the South
line of Lot 32 extended Easterly; thence South 11 degrees 01’00" West
170.38 feet; thence North 88 degrees 31’00" West 380.00 feet parallel
with and 185.00 feet South of the East – West one-quarter line; thence
south 01 degrees 16’48" West 315.84 feet along the West line of the
East 60.00 feet of the west one-half of the Southeast one-quarter of
said section; thence North 88 degrees 22’52" West 440.00 feet along
the North line of the South 824.53 feet of the North – West
one-quarter of the Southeast one-quarter of said section; thence North
01 degrees 16’48" East 499.80 feet to the place of beginning. (41.7529
acres excluding right of way).
Section III. General Provisions.
The following provisions shall hereby apply to the Project, in
addition to those Provisions outlined in Chapter 16 of the Cascade
Charter Township Zoning Ordinance (Ordinance No. 11 of 1988, as
amended).
Section IV. Purpose.
The Project occupies approximately 42 acres of land that presently
contains an office building, manufacturing facility, wetlands, and
vacant property. The Project is proposed to be developed into an
office complex. The Planned Unit Development technique has been chosen
by the Developer to provide more control over the Project’s aesthetics
and appearance. This development technique provides the Developer with
the ability to develop the Project in a manner to meet market
expectations and develop the project in a unified manner.
The regulations contained herein are established to define the
procedures necessary to insure high quality development in the
Project. Additionally, they are designed to achieve integration of
this development with adjacent land uses.
Section V. Approval Limitations.
A. The provisions of this Ordinance are not intended as a
substitute for the Cascade Charter Township Zoning Ordinance and the
General Development Plan, nor do they in any way relieve the Developer
from obtaining all approvals and permits required by the township,
except as otherwise expressly provided herein. In the event that a
development issue or site plan element is not addressed by this
Ordinance, the specifications and requirements of the Cascade Charter
Township Zoning Ordinance shall be enforced.
B. Except as otherwise provided herein, the Developer and his
assigns must meet all applicable provisions and regulations of Cascade
Charter Township, as well as federal and state law, and must obtain
all necessary approvals from state and county governmental agencies
that are required for operation or use.
C. This PUD approval is expressly contingent upon all conditions of
approval herein remaining fully effective and valid. If any condition
imposed herein is determined to be illegal or contrary to law as a
result of a successful legal challenge by the Developer or its
assigns, or any other party, the Township reserves the right to review
the entire Project under the PUD provisions of the Cascade Charter
Township Zoning Ordinance, and further, to withdraw its approval of
this PUD if it finds that, absent the effect of any condition imposed
herein, the PUD no longer meets the standards for PUD approval
contained in the Zoning Ordinance.
D. All conditions contained herein shall be binding upon the
Developer, as well as its successors, tenants and assigns. The
conditions may be modified or amended only pursuant to a formal
amendment of the PUD approval and ordinance amendment.
E. This approval document shall be recorded with the Kent County
Register of Deeds by the Developer prior to construction occurring on
site and shall run with and bind the lands involved. Copies of this
recorded document shall be supplied by the Developer to the Cascade
Charter Township Clerk.
F. Failure to comply with the site plan or any condition of
approval herein shall be deemed a violation of the Cascade Charter
Township Zoning Ordinance.
Section VI. Permitted Uses.
The permitted uses for the Golf View Office Park PUD do not include
any retail sales operations, the following uses are allowed:
EXISTING
A. One (1) 20,000 square foot corporate office building.
PHASE 1
B. The renovation of the existing Lack’s manufacturing and
warehousing facility will be broken down into three (3) multi-use
office buildings, each building is separated by an open atrium. The
maximum square footage of all three buildings is 127,000 square feet.
Uses permitted within this building shall be limited to those listed
below:
1. Computer design and service business
2. Health/Sports Club
3. Professional Office
4. Church
5. Executive and administrative offices, data processing
centers and business offices such as real estate, insurance, and
non-profit organizations.
6. The amount of square footage devoted to office uses shall be
allowed to a maximum of 92,000 square feet. The total square
footage of the building will not exceed 127,000 square feet. A
minimum of 35,000 square feet shall be devoted to the
Health/Sports Club.
PHASE 2
C. One (1) professional office building containing a maximum of
60,000 square feet, labeled building "D" on the approved site plan.
This building may be developed originally as one 40,000 square foot
office, with a maximum addition in the future of 20,000 square feet.
The building is intended to be used as an office facility for an
engineering firm.
PHASE 3
D. Two (2) office buildings containing a maximum of 10,000 square
feet each. These are buildings labeled "A" and "B" on the approved
site plan and are subject to the design requirements of the Cascade
Road Spaulding Avenue Corridor Study.
PHASE 4
A. Two (2) professional office buildings containing a maximum of
30,000 square feet each located toward the rear of the property and
labeled buildings "E" and "F" on the approved site plan. These
buildings are intended to be used for the future development of the
same engineering firm.
PHASE 5
B. One (1) office building containing a maximum of 10,000 square
feet. This building is labeled "C" on the approved site plan and is
subject to the design requirements of the Cascade Road Spaulding
Avenue Corridor Study.
Section VII. Master Development Plan – Phasing.
The project shall conform in as much as reasonably possible to the
master development plan approved by the Township Board and signed by
the Township Supervisor on September 30, 1999. The Developer will
develop the project in five (5) separate and distinct phases, and will
be required to submit site plans for each phase, building, or site
improvement. This includes the plans for Phase 1. This will also allow
the Township to ensure that only those areas needed to be disturbed
for each phase, are the areas planned to be disturbed. The Planning
Commission shall review and approve all building or site improvement
plans prior to the construction of each phase to insure consistency
with the master development plan.
All phases of the Project shall comply with the Permitted Uses
listed in Section VI and the specific Development Regulations in
Section VIII of this Ordinance. Site plan approval of each phase,
building, or site improvement shall only be granted in accordance with
Chapters 16 and 21 of the Zoning Ordinance, as may be amended.
Each phase shall be considered complete with the issuance of the
required occupancy permit granted by the Township. Phase 1, 2 and 3
can occur concurrently and must be completed in entirety prior to the
commencement of any site work or construction of Phase 4 and 5.
Section VIII. Specific Development Regulations.
The Project shall be developed in accordance with the site plan
approved and signed by the Township. The site plan shall indicate
where each building will be located and provide appropriate
measurements demonstrating compliance with this ordinance. Engineering
plans and documents relating to utilities, topography, drainage, and
the survey of the Project shall be reviewed and approved by the
Township Engineer. Approval of these documents shall be based upon
their meeting recognized, acceptable engineering standards and
practices. No alterations, expansions or additions may take place to
the Project without an amendment to this Ordinance, unless authorized
otherwise herein.
A. Design Guidelines, Requirements and Limitations.
With the exceptions listed below, all of the requirements of the
Cascade Township Zoning Ordinance, as may be amended, must be complied
with for site plan review for any new construction within the Project.
Landscaping shall be provided within each Phase consistent with the
approved landscape plans for each site as their individual site plans
are considered for approval.
Phase 1 (existing Lack’s Manufacturing building)
a. Maximum Building Square Footage – 127,000 square feet
92,000 square feet – office
35,000 sports related
b. Maximum Building Height – 45 feet
c. Parking – The total amount of parking for Phase 1 shall
be a maximum of 496 parking spaces.
d. Setback Requirements – No part of the building shall
extend closer to the lot line than currently exists.
Phase 2 (One Building, marked Building "D" on the approved site
plan)
a. Maximum Building Square Footage – 60,000 square feet
b. Maximum Building Height – 32 feet
c. Parking – The total amount of parking for Phase 2 shall
be a maximum of 231 parking spaces.
d. The buildings must be constructed of an actual sloped or
pitched roof on all sides of the building.
e. The material of the roof to be considered at the time of site
plan review.
f. No access directly to Cascade Road, access to come from
the one and only curb cut on Cascade Road for the development,
and the one and only curb cut on Galbraith.
Phase 3 (Two Buildings, marked Buildings "A" and "B" on the
approved site plan)
a. Maximum Building Square Footage – 20,000 square feet,
with a maximum building size of 10,000 square feet for each
building.
b. Maximum Building Height – 25 feet
c. Parking – The total amount of parking for Phase 3 shall
be a maximum of 82 parking spaces. Due to the topography near
buildings "A" and
B" parking to be allowed in the front yard provided it is well
screened from Cascade Road. This will be assured during site
plan review. The berm along Cascade Road to remain.
d. The buildings must be constructed of an actual sloped or
pitched roof on all sides of the building.
e. The material of the roof to be considered at the time of
site plan review.
f. No access directly to Cascade Road, access to come from
the one and only curb cut on Cascade road for the development,
and the one and only curb cut on Galbraith.
g. The buildings must be at least 50% owner occupied.
h. Increased landscaping where necessary.
Phase 4 (Two Buildings, marked "E" and "F" on the approved site
plan)
a. Maximum Building Square Footage – 60,000 square feet
Two 30,000 square foot buildings
b. Maximum Building Height – 32 feet
c. Parking – The total amount of parking for Phase 2 shall
be a maximum of 232 parking spaces.
d. The buildings must be constructed of an actual sloped or
pitched roof on all sides of the building.
e. The material of the roof to be considered at the time of
site plan review.
f. No access directly to Cascade Road, access to come from
the one and only curb cut on Cascade Road for the development,
and the one and only curb cut on Galbraith.
Phase 5 (One Building, marked "C" on the approved site plan)
a. Maximum Building Square Footage – 10,000 square feet
b. Maximum Building Height – 25 feet
c. Parking – The total amount of parking for Phase 5 shall
be a maximum of 42 parking spaces. Parking to be located as
shown on the approved site plan. This will be assured during
site plan review.
d. The buildings must be constructed of an actual sloped or
pitched roof on all sides of the building.
e. The material of the roof to be considered at the time of site
plan review.
f. No access directly to Cascade Road, access to come from
the one and only curb cut on Cascade Road for the development,
and the one and only curb cut on Galbraith.
g. The buildings must be at least 50% owner occupied.
h. Increased landscaping where necessary.
Section IX. Setbacks.
The setbacks for each phase and building shall comply with the
approved PUD site plan dated September 30, 1999, in as much as
possible. This will be assured when each phase submits for site plan
approval.
Section X. Signs.
The following signs shall be permitted for Phase 1, 2, 3, 4, and 5:
1. One (1) freestanding ground mounted development
identification sign along Cascade Road. Such sign shall contain no
more than 50 square feet and shall not be lighted in any manner.
Subject to the provisions of the Cascade Charter Township Sign
Ordinance (Ordinance 12 of 1988, as amended).
2. One (1) freestanding ground mounted development
identification sign along Galbraith Avenue. Such sign shall
contain no more than 50 square feet and shall not be lighted in
any manner. Subject to the provisions of the Cascade Charter
Township Sign Ordinance (Ordinance 12 of 1988, as amended).
3. One (1) wall sign or marquee per building, not to exceed
fifty (50) square feet in total sign area. Or, one (1)
awning/canopy sign per building, not to exceed thirty-two (32)
square feet in total sign area. In the event the building has
multiple tenants, each tenant space will be allowed a sign area
equal to one square foot for each linear foot of building frontage
that each respective tenant occupies, not to exceed a sign length
of more than two-thirds the subject frontage and a height of 24
inches.
4. The non-conforming Billboard sign located on the property
must be removed before the start of Phase four or Five.
5. One directional sign shall be allowed for each building in
the project. The total size ach directional sign shall be no
larger than 10 square feet. The placement for the signs shall be
regulated by the Sign Ordinance for directional signs and shall be
placed to avoid seeing the directional signs from Cascade Road.
Section XI. Temporary Buildings.
No structure of a temporary nature; trailer, tent or construction
shack shall be constructed, placed or maintained within the Project
except accessory to and during construction/renovation of buildings or
infrastructure improvements.
Section XII. Land Splits
The entire premises shall be under the control of one owner. Should
the developer request smaller lots, permission to perform a Land
Division must be granted by the Planning Department. The Planning
Department will review the proposed land division under the criteria
of the Land Division Act and the Cascade Charter Township Zoning
Ordinance. In no case shall any lot be smaller than 2 Acres in size.
Section XIII. Utilities.
A. Public Water and Sanitary Sewer – All buildings within the
Project shall be served by public sanitary sewer and water at the
developer’s expense. No building permits will be issued for any
construction within the Project until final approval of the public
utility system is approved by the City of Grand Rapids and Cascade
Township. This does not preclude the applicant from starting on Phase
1. However, no Occupancy Permit will be granted for Phase 1 until the
utilities are approved.
B. Stormwater Drainage – All proposed stormwater drainage
facilities shall be reviewed and approved by the Township Engineer and
the Kent County Drain Commissioner’s office prior to the development
of the Project. The Developer shall provide the Township Planning
Department with copies of all correspondence and permits received from
the Kent County Drain Commissioner and Michigan Department of
Environmental Quality regarding stormwater disposal and wetland
issues.
C. The Developer shall provide all necessary easements within the
Project for telephone, electricity, gas and cable television to the
appropriate utility provider without cost. Said easements shall be
recorded with the Kent County Register of Deeds and provided to each
utility provider for their records.
Section XIV. Lighting.
The required lighting section of the Zoning Ordinance as amended
shall regulate lighting for the entire project. Furthermore, the total
height of individual light poles shall be limited to a maximum of 20
feet high. The use of wall pack and/or unshielded lights is
discouraged unless in areas not viewed by the public or passerby.
Section XV. Soil Erosion Control Requirements.
Prior to each phase of construction, the Developer shall submit a
soil erosion control plan showing all temporary and permanent soil
erosion control measures to be taken before, during, and after
construction on the Project. This plan shall be reviewed and approved
by the Township Engineer prior to commencing any building on the site.
Section XVI. Performance Guarantee.
To insure compliance with this Ordinance and any conditions herein,
Cascade Township may require reasonable performance guarantees, as
authorized under the Township Rural Zoning Enabling Act to insure
completion of improvements such as, but not limited to, landscaping,
drainage, lighting, roads and utilities. The Township Board, Engineer,
or Planning Department may require such guarantees at any time they
deem necessary to insure completion of the improvements.
Section XVII. Reimbursement of Review Fees.
The Developer shall reimburse the Township for all fees associated
with the review of the Project. These fees may include, but not be
limited to, legal, engineering, publishing, and planning review fees.
Section XVIII. Consistency With Planned Unit Development (PUD)
Standards.
The rezoning to Planned Unit Development will result in a
recognizable benefit to the ultimate users of the Project and to the
community. The conversion of a manufacturing building to an office
complex is viewed as a more compatible use to adjacent residential and
recreational land uses.
In relation to the underlying zoning (R1, Residential and PUD,
Planned Unit Development) the township finds the Project will not
result in a material increase in the need for public services. Utility
extensions and construction will be the responsibility of the
Developer and will not place a material burden upon the subject
property or the surrounding properties. The Project is not anticipated
to cause undo impact to the stormwater drainage of the surrounding
area. All stormwater and soil erosion control plans have been approved
by the Township Engineer and the appropriate County and State
agencies. All stormwater created by this development will be
maintained on site.
The Project has been determined by the Township to be compatible
with the General Development Plan of the Township and with the spirit
and intent of the Planned Unit Development Chapter of the Zoning
Ordinance. The Project is also consistent with the standards
recommended in the Cascade Road Spaulding Avenue Corridor Study.
The Township finds the Project will not result in an unreasonable
negative economic impact upon surrounding properties.
The Township finds the Project to have more wetlands, green areas,
and usable open space than would typically be required by the Township
Zoning Ordinance.
Finally, the Township recognizes the Project will be under single
ownership or control. The Township recognizes that the Developer or
its assigns will retain ownership and control of the project until
some of the buildings may be sold to other parties.
Section XIX. Effective Date.
This Ordinance shall become effective upon publication of the
ordinance, or a summary thereof, in The Grand Rapids Press, a
newspaper of general circulation within Cascade Charter Township. All
prior Planned Unit Development ordinances that were previously
approved for this property shall become null and void.
The foregoing Ordinance was offered by Board Member Timmons,
supported by Board Member Kleinheksel. The roll call vote being as
follows:
YEAS: Timmons, Kleinheksel, Goodyke and Julien.
NAYS: Johnson, Carpenter, and Parrish.
ABSENT: None
Marlene Kleinheksel
Cascade Charter Township Clerk
CERTIFICATION
I hereby certify the foregoing to be a true copy of an Ordinance
adopted at a Regular Meeting of the Cascade Charter Township Board on
the 30th day of September, 1999.
Marlene Kleinheksel
Cascade Charter Township Clerk
CASCADE CHARTER TOWNSHIP
Ordinance #8 of 2000
AN ORDINANCE TO AMEND ORDINANCE #10 OF 1997, THE
FOREST HILLS GOLF COURSE/WATERMARK CONDOMINIUMS
PLANNED UNIT DEVELOPMENT PROJECT.
CASCADE CHARTER TOWNSHIP ORDAINS:
Section 1. Amendments to the Forest Hills Golf Course/Watermark
Condominiums PUD Ordinance
Section VIII (A)(2) of the Ordinance shall be amended in its
entirety to read as follows:
a. Maximum Number of Residential Units – The Project shall be
limited to 88 building sites for single family detached
condominium units, 45 sites for traditional condominiums and 11
sites for Estate Homes, which will contain a maximum of three (3)
units per building. The number of building sites within the
Project shall not be increased by the Township Board.
d. All clubhouse condominium units shall be separated from each
other by at least 25 feet. All Estate Homes shall be setback and
separated from each other as shown on the site plan dated 5-31-00.
e. Minimum Floor Area – Each site condominium unit shall
contain a minimum of 2,000 square feet of finished livable area
above grade level, exclusive of the garage, decks, porches and
breezeways. Each club home condominium shall contain a minimum of
1,600 square feet of livable area above grade level, exclusive of
the garage, decks, porches and breezeways. Each estate home shall
contain a maximum of three (3) units per building, with one unit
containing a minimum of 1,200 square feet of livable area above
grade level, exclusive of the garage, decks, porches and
breezeways. The remaining two units shall contain a minimum of
1,800 square feet of livable area above grade level, exclusive of
the garage, decks, porches and breezeways.
Section VIX(A) of the Ordinance shall be amended in its entirety to
read as follows:
9. Sidewalks shall be provided on one side of the private road
within the Project at the Developer’s expense. The sidewalks in
Phase I, II and III must be completed within thirty-six (36)
months after the date on which a Master Deed for each phase of
Watermark is recorded. The sidewalk along Watermark Drive within
the Project shall be open for public use at all times.
10. Overhead street lights shall be placed at the existing
Cascade Road and Watermark Drive intersection and at the proposed
Spaulding Road and Watermark Drive intersection, at the
developer’s expense, by December 2000.
11. The Developer, at their expense, shall install a left turn
lane on Spaulding Road, at the Spaulding Road and Watermark Drive
intersection and shall install a deceleration lane on Spaulding
Road. The Developer shall also install a deceleration lane 12 feet
wide for 125 feet on Cascade Road.
Section 2. Effective Date.
This PUD Ordinance amendment shall become effective upon
publication in The Grand Rapids Press, a newspaper of general
circulation within Cascade Charter Township.
Section 3. Effect
The Cascade Charter Township Zoning Ordinance, as amended, and the
remainder of Ordinance #10 of 1997, except as otherwise expressly
amended herein, shall remain in full force and effect.
The foregoing Ordinance amendment was offered by Board Member
Parrish, supported by Board Member Kleinheksel. The roll call vote
being as follows:
YEAS: Julien, Carpenter, Kleinheksel, Timmons, Goodyke, Johnson,
Parrish.
NAYS:
ABSENT:
ORDINANCE DECLARED ADOPTED.
Marlene Kleinheksel
Cascade Charter Township Clerk
CERTIFICATION
I hereby certify the foregoing to be a true copy of an Ordinance
adopted at a regular meeting of the Cascade Charter Township Board on
the 31st day of May, 2000.
Marlene Kleinheksel
Cascade Charter Township Clerk
CASCADE CHARTER TOWNSHIP
Ordinance #17 of 2000
AN ORDINANCE TO AMEND ORDINANCE #10 OF 1997, THE FOREST HILLS GOLF
COURSE/WATERMARK CONDOMINIUMS PLANNED UNIT DEVELOPMENT PROJECT CASCADE
CHARTER TOWNSHIP ORDAINS:
Section 1. Amendment to the Forest Hills Golf Course/Watermark
Condominiums PUD Ordinance
Section II. Legal Description.
The following described property shall be amended into the
Watermark Condominium PUD
Part of the Northwest one-quarter of the Southeast one-quarter of
Section 6, Town 6 North, Range 10 West, Cascade Township, Kent County,
Michigan, described as follows: Beginning North 88 degrees 31 minutes
00 seconds West 1382.97 feet (as measured along the East-West
one-quarter line) and south 01 degrees 16 minutes 48 seconds West
185.00 feet (as measured along the West line of the East 60.00 feet of
the Northwest one-quarter of the Southeast one-quarter of said
section) from the East one-quarter corner of said Section 6; thence
South 01 degrees 16 minutes 48 seconds West 315.84 feet; thence North
88 degrees 22 minutes 52 seconds West 440.00 feet along the North line
of the South 824.53 feet of the Northwest one-quarter of the Southeast
one-quarter of said section; thence North 01 degrees 16 minutes 47
seconds East 297.80 feet; thence South 88 degrees 31 minutes 00
seconds East 140.00 feet; thence South 01 degrees 29 minutes 00
seconds West 16.00 feet; thence South 88 degrees, 31 minutes 00
seconds East 163.00 feet; thence North 01 degrees 29 minutes 00
seconds East 21 feet; thence South 88 degrees 31 minutes 00 seconds
East 47.00 feet; thence North 83 degrees 53 minutes 00 seconds East
90.73 feet to the place of beginning.
2.9815 acres
The following legal description describes a parcel to be leased
from Consumers Energy
Part of the Northwest one-quarter of the Southeast one-quarter and
part of the Southwest one-quarter of the Northeast one-quarter of
Section 6, Town 6 North, Range 10 West, Cascade Township, Kent County,
Michigan, described as follows: Beginning on the East-West one-quarter
line at a point being North 88 degrees 31 minutes 00 seconds West
1822.96 feet from the East one-quarter corner of said Section 6;
thence South 01 degrees 16 minutes 47 seconds West 270.00 feet along
the West line of the East 500.00 feet of the Northwest one-quarter of
the Southeast one-quarter of said section; thence North 88 degrees 31
minutes 00 seconds West 230.00 feet; thence North 01 degrees 16
minutes 47 seconds East 409.92 feet; thence South 88 degrees 31
minutes 00 seconds East 225.83 feet; thence South 00 degrees 25
minutes 43 seconds East 140.00 feet (along a line which goes through a
point being 101.65 feet Northwesterly (as measured along a line being
parallel with and 70.00 feet Southwesterly of the centerline of
Cascade Road) of the West line of the East 500.00 feet of the West
one-half of the Northeast one-quarter of said section) to the place of
beginning.
2.1577 acres
Section II. Permitted Uses.
The following use shall be amended into the Watermark PUD
Ordinance:
G. Swim Center
Section 2. Effective Date
This PUD Ordinance amendment shall become effective upon
publication in the Grand Rapids Press, a newspaper of general
circulation within Cascade Charter Township.
Section 3. Effect
The Cascade Charter Township Zoning Ordinance, as amended, and the
remainder of Ordinance #10 of 1997, except as otherwise expressly
amended herein, shall remain in full force and effect.
The foregoing Ordinance amendment was offered by Board Member
Timmons, supported by Board Member Goodyke. The roll call vote being
as follows:
YEAS: Julien, Carpenter, Kleinheksel, Timmons, Goodyke, Parrish
NAYS: Johnson
ABSENT:
ORDINANCE DECLARED ADOPTED.
Marlene Kleinheksel
Cascade Charter Township Clerk
CERTIFICATION
I hereby certify the foregoing to be a true copy of an Ordinance
adopted at a regular meeting of the Cascade Charter Township Board on
the 18th day of October 2000.
Marlene Kleinheksel
Cascade Charter Township Clerk
CASCADE CHARTER TOWNSHIP
Ordinance # 6 of 2003
AN ORDINANCE TO AMEND ORDINANCE #9 of 1999, THE
GOLFVIEW OFFICE PARK
PLANNED UNIT DEVELOPMENT PROJECT.
CASCADE CHARTER TOWNSHIP ORDAINS:
Section 1. Amendment to the Golfview Office Park PUD Ordinance
Section V. Approval Limitations. The following paragraph shall be
added to the Golfview Office Park PUD
F. The developer shall have approved and recorded the Declaration
of Building and Use restrictions for the entire PUD as submitted to
the Township Board. These restrictions shall be for the purpose of
insuring the use of the parcels for the purposes as stated in the
approved PUD and for the purpose of preserving the attractiveness and
future maintenance of the PUD. Finally the Township shall be notified
and must approve any amendments to the declaration.
Section 2.
Section VIII. Specific Development Regulations. Phase 3. g. The
following paragraph shall be amended as follows
g. The building must be at least 50% owner occupied for a period of
at least 5 years after the first owner occupant purchases the
building. The existing recorded restrictive covenant concerning owner
occupancy shall be amended to reflect the changes made by this
amendment to the PUD.
Section 3. Effective Date
This PUD Ordinance amendment shall become effective upon publication
in the Grand Rapids Press, a newspaper of general circulation within
Cascade Charter Township.
Section 4. Effect
The Cascade Charter Township Zoning Ordinance, as amended, and the
remainder of Ordinance #9 of 1999, except as otherwise expressly
amended herein, shall remain in full force and effect.
The foregoing Ordinance amendment was offered by Board Member
Timmons, supported by Board Member Goodyke. The roll call vote being
as follows:
YEAS: Timmons, Goodyke, Carpenter, Julien, Kleinheksel, Jones
NAYS: None
ABSENT: Parrish
ORDINANCE DECLARED ADOPTED.
Marlene Kleinheksel
Cascade Charter Township Clerk
CERTIFICATION
I hereby certify the foregoing to be a true copy of an Ordinance
adopted at a regular meeting of the Cascade Charter Township Board on
the 28th day of May 2003.
Marlene Kleinheksel
Cascade Charter Township Clerk

Government
~ Departments ~
Community
Business ~
Reference Desk ~
What's Happening
Help ~
Home ~ Search ~ Site Map
Comments? Feedback? Questions? Click here to send an email.
Site Use Policy
This page last modified
06/08/04.
All information © 2003-2004Cascade Township, Michigan
|
Site
Design/Development by
 |
|